Week 10: Roof work continues (Tues)

The builder has restarted after the Christmas break. We have lost quite a bit of time, but he has assured us we should be watertight in 2 weeks. So we shall see. Joe has worked out that the builder has miscalculated the height of the window. So he has had to add an extra two rows of bricks to ensure we can get a worktop under the sill. The outer wall is higher than the inside wall as the window frame attaches to the outside skin only. Here are a few pics from today.