Wall rebuilt and cavity floor cemented (Wednesday)

Today the builder concreted the floor of the small cavity (between us and the neighbour) with a run off. As this gap is only about 20cm and thus inaccessible, this will prevent weeds from coming up and also will allow water to run off outside. Then they started building the walls back up.