Friday, 28 November 2014

Membrane laid and concrete pour (Friday)

Today a lorry full of sand arrived and the builders spread it out over the shingle. This protects the membrane from being pierced by any sharp stones. Then the membrane was laid on top o the sand and over the foundation walls. This marks the damp course.

Three hours later the cement lorry arrived and the boys wheeled through 2 cubic metres of cement. Stuart the builder spread it out and levelled it. Tomorrow morning we will be able to walk out on it and our dogs can come home.

Membrane is laid

Cement is poured...

Cement is levelled
Eh voila!