Tuesday, 25 November 2014

Walls are built (Tuesday)

Thankfully a nice dry day, and our footings had dried out, ready to be built upon! The outer skin and inner wall were constructed up to the DPC (damp proof course). Concrete lintels were put over the drains. Tomorrow they will start on the base.

Outer and inner skins with cavity

Building up the inner wall

Lintel above drains

Lintel above rodding eye



The outer skin will be built up in red brick


Lintel above drains

Internal measurements can now be calculated more accuraately

Internal measurements